Contact Us
Products
Double worm slew drive (S-2 SE-2 type)
Description:
SE-2 Series slewing drives are combined by VE Housing, slewing ring, two hourglass worm and some Matching parts, it achieved 2 times of tooth contacting. In the same volume and installation space, it improved nearly double output torque, greatly improving the product's performance.
Double-worm slew drive has more rotator in the basic of single-worm slew drive.
Please click the model number to check the drawing for Double worm slew drive.
<
Model Data | Output Torque | Tilting Moment | Holding Torque | Gear Ratio | Tracking Precision | Weight |
SE14-2/S14-2 | 6.5kN.m | 33.9kN.m | 38.7kN.m | 61:01:00 | <=0.2° | 42kg |
SE17-2/S17-2 | 7.5kN.m | 54.3kN.m | 43kN.m | 78:01:00 | <=0.2° | 48kg |
HSE21-2 | 8kN.m | 67.8kN.m | 48kN.m | 85:01:00 | <=0.2° | 55kg |
HSE25-2 | 10kN.m | 135.6kN.m | 72.3kN.m | 102:01:00 | <=0.15° | 87kg |
DRE hot and common slewing drives are listed in the table.
<
Open Housing Slew Drive | S9 | S12 | S14 | S17 | |||||
Enclosed Housing Slew Drive | SE3C/PE3C | SE5A/PE5A | SE7/PE7 | SE9A/PE9A | SE12A/PE12A | SE14A/PE14A | SE17/PE17 | SE21/PE21 | SE25/PE25 |
Double Worm Slew Drive | SE14-2/S14-2 | SE17-2/S17-2 | SE21-2/S21-2 | SE25-2/S25-2 | |||||
Modular Vehicles Slew Drive | HSE21 | HSE25 | HSE21-2 | HSE25-2 | |||||
Worm Gear Slew Drive | WE9 | WE12 | WE14 | WE17 | WE21 | WE25 | |||
Dual Axis Slew Drive | SDE3/PDE3 | SDE5 | SDE9 | SDE12 | SDE14 | SDE17 |
PM60 (标准) 铁路长度 L2(mm) 总长度 L1(mm) 最大 Stroke(mm) G(mm) K(mm) n m Mass(kg) A1 块 A2 块 A1 块 A2 阻止 150 220 60 - 25 100 2 2 1.5 - 200 270 110 - 50 100 2 2 1.8 - 300 370 210 135 50 200 3 2 2.4 2.7 400 470 310...
Hot tags : linear module industrial robot
PM (轻型) 铁路长度 L2(mm) 总长度 L1(mm) 最大 Stroke(mm) G(mm) K(mm) n m Mass(kg) S1 块 S2 块 S1 块 S2 阻止 150 220 85 34 25 100 2 2 1.4 1.6 200 270 135 84 50 100 2 2 1.7 1.9 300 370 235 184 50 200 3 2 2.3 2.5 400 470...
PM86(Standard) 铁路长度 L2(mm) 总长度 L1(mm) 最大 Stroke(mm) H(mm) n m Mass(kg) A1 块 A2 块 A1阻止 A2 阻止 340 440 210 100 70 3 2 5.7 6.5 440 540 310 200 20 4 3 6.9 7.7 540 640 410 300 70 5 3 8 8.8 640 740 510 400 2...
PM86(Light Duty) 铁路长度 L2(mm) 总长度 L1(mm) 最大 Stroke(mm) H(mm) n m Mass(kg) S1 块 S2 块 S1阻止 S2 阻止 340 440 246 170 70 3 2 5.4 5.9 440 540 346 270 20 4 3 6.6 7.1 540 640 446 370 70 5 3 7.7 8.2 640 740 546 4...
铁路长度 L2(mm) 总长度 L1(mm) 最大 Stroke(mm) G(mm) H(mm) n m Mass(kg) A1 块 A2 块 A1 块 A2 阻止 980 1089年 828 700 40 90 7 5 18.6 20.3 1080年 1189年 928 800 15 40 8 6 20.3 22 1180年 年代定为 1289年 1028年 900 65 90 8 6 22 2...
铁路长度 L2(mm) 总长度 L1(mm) 最大 Stroke(mm) G(mm) H(mm) n m Mass(kg) A1 块 A2 块 A1 块 A2 阻止 980 1098年 811 659 40 90 7 5 29.4 32.3 1180年 第 1298年 1011年 859 65 90 8 6 34.3 37.2 1380年 1498年 1211年 1059年 90 90 9 7 3...